So, after a particularly heavy night at Beer Club, I am faced with the need to step up production due to the club's burgeoning membership. The problem, as usual, is the time taken from brew to drinking.
Assuming it will be bottled (which most beers for beer club will be), a typical kit will spend 14 days fermenting, 2-3 days in the bottling bucket, a week warm conditioning and then a minimum of four weeks cold conditioning before it even becomes drinkable. That's 7-8 weeks from brewing. Kit beers taste even better when allowed to condition for 6-12 weeks so that'as anything up to four months.
As I wibbled earlier this year, I've been making lager which requires a three week lagering (obviously) period between fermenting and bottling and it then requires the full 12 weeks conditioning. The Brewferm Gold I brewed first thing this year is unlikely to be ready until mid May at the earliest. Not only does it take an age to be ready but it ties up a fermenter for five weeks. These days I have four FV's (fermenting vessels); two standard fermenters, one bottling bucket (fermenting vessel with little bottler attached) and a wine fermenter which doubles as another bottling bucket and a cider fermenter.
I've released my inner nerd and knocked up a spreadsheet which enables me to schedule my brewing and maximise my productivity but it is still only going to give me drinking beer mid May. I seems my options are either to buy a fifth fermenter so that I can double production in the short term or to invest in a 10 gallon all grain set up which finances dictate will probably occur in September. I've just put a request on my local Freecycle/Freegle board and we'll see what happens but an extra fermenter looks like the only option in the short term. Running out of beer would be, frankly, disastrous.